Our first try with a material with lots of scattering. Almost all of the color of the dragon comes from photon beams being scattered around inside the dragon. It is still painfully slow, and we still haven't used a proper phase function, but I think the soft appearance of the model is a step in the right direction.


No comments:
Post a Comment